Solar Energy Plant

Solar power plants (GES) convert the rays received from the sun into direct current by the cells on the panels. As direct current (DC) is not used in the world, the current we obtain is required to be transformed into alternative current (AC). These transformations can be done by inverters. According to the purpose of the usage of inverters, the energy obtained from the sun is used as systems are connected to the network or not.

Polatlı;

Our power plant has been installed in Polatlı District of Ankara Province. Our power plant’s power has been designed and installed as 8 MW. Inverters of the plants are central system inverters. The DC power produced within the site reach the central inverter via cables and converted to AC power. In our plants panels in the power of 265 Wp have been used.

Kurşunlu;

Our power plant has been installed in Kurşunlu District of Çankırı Province. Our power plant’s power has been designed and installed as 7 MW. The inverters of the plants are chosen to be in the power of 66 kW and installation of 105 inverters in total have been realized. Each inverter produces its own AC power and transfers to the main collection panel. In our plants panels in power of 320 Wp have been used.

Atkaracalar;

Our power plant has been installed in Atkaracalar District of Çankırı Province. Our power plant’s power has been designed and installed as 2 MW. The inverters of the plants are chosen to be in the power of 66 kW and installation of 30 inverters in total have been realized. Each inverter produces its own AC power and transfers to the main collection panel. In our plants panels in power of 320 Wp have been used.

Sivrihisar;

Our power plant has been installed in Sivrihisar District of Eskişehir Province. Our power plant’s power has been designed and installed as 3,75 MW. The inverters of the plants are chosen to be in the power of 66 kW and installation of 90 inverters in total have been realized. Each inverter produces its own AC power and transfers to the main collection panel. In our plants panels in power of 320 Wp have been used.

Manisa;

Our power plant has been installed in Salihli District of Manisa Province. Our power plant’s power has been designed and installed as 5 MW. The inverters of the plants are chosen to be in the power of 66 kW and installation of 75 inverters in total have been realized. Each inverter produces its own AC power and transfers to the main collection panel. In our plants panels in power of 265 Wp have been used.

Çifteler;

Our power plant has been installed in Çifteler District of Eskişehir Province. Our power plant’s power has been designed and installed as 1 MW. The inverters of the plants are chosen to be in the power of 66 kW and installation of 15 inverters in total have been realized. Each inverter produces its own AC power and transfers to the main collection panel. In our plants panels in power of 320 Wp have been used.

Services

  1. Investigation and Preparation of Feasibility Report
  2. Site Determination and Compliance Work
  3. Conduct of EMRA License or Invitation Letter Application Process
  4. Preparation and Approval of MENR Projects
  5. Electromechanical Equipment Selection
  6. Consulting Services in Plant Installation Phase
  7. Implementation of Acceptance Procedures
  8. Maintenance, Repair and Operation Services